Steam boiler house 50 t/h <br>
CONTACT US

Steam boiler house 50 t/h

Two stages of steam boiler houses equipped with ENTROPIE  boilers TT200 were put into operation.
The first stage of 20 tons of steam per hour – 4pcs of ENTROPIE boilers TT200 with steam capacity of 5 t/h each, were put into operation in 2010.
The second stage of 30 tons of steam per hour – 3pcs of ENTROPIE boilers TT200 with steam capacity of 10 t/h each, were put into operation in 2012.
The main equipment of boiler rooms:
- The boilers are equipped with automatic system of all processes management and control;
- Shut-off and control valves;
- Oilon Gas burners.